NOW! TACOMA SHUT DOWN Blockade at fracked gas plant opposed by Puyallup Indian Nation

By Last Real Indians Censored News December 18, 2017 All three entrances to the construction site for a fracked gas plant at the Port of Tacoma have been successfully blockaded! Workers have been sent home.Water protectors continue to occupy and block the entrances. The proposed fracked gas plant at the Port would hold 8-million gallons of liquefied natural gas from the Bakkens. It is

Originally posted from CENSORED NEWS which can be read here.

Leave a Reply