Camp Makwa’s New Solar Office, Frontline Resistance to Tar Sands, Enbridge Line 3

Mazaska Talks‏ @MazaskaTalks 46m46 minutes ago More Our first real office is officially up & solar powered at #CampMakwa ! Featuring the banner @RAN made for the @jpmorgan AGM #DefundLine3 "We are an Anishinaabe led group of water protectors dedicated to shutting down the construction of the Line 3 pipeline using non-violent direct action. Stand with us to protect our sacred land

Syndicated from CENSORED NEWS.

Leave a Reply